TSR Installs

AusDigi have noticed that a large number of TSR installs from some technicians do not have the “Sniffer Port” connected. We remind all technicians that the sniffer is required under the scope of works and install documents to be connected to the venue MATV...

Safety Reminder

Following an incident on the weekend of 2nd November 2024, this is a timely reminder that everyone shares responsibility for safety in the workplace and to ensure your SWMS, Safety Systems, OHS Procedures and Incident Reporting Systems are up to date. Whilst we are...

Job Closure Photos

Please ensure you are following the correct photo requirements for each job to avoid having a job closure rejected. All photos must be electronically labelled in Fleet to reflect what they are. For TSR Installs and Swapouts the following photos are required : Signoff...

Verizon Work Procedure

A reminder to all technicians that Fleetmatics Work is designed to assist all parties in managing their workload and jobs. The system is designed to give all parties the ability to effectively plan their works and advise others so they can also plan around dates and...

LED Walls – 80m Advertising Display

Screens and Signage AusDigi were recently selected to supply and install a bespoke 80m long Large Screen LED Wall for agile advertising. AusDigi designed and built the system to incorporate 83 panels on a custom framing solution, designed and constructed in-house...